Dholera Solar Park shiri ne, babban aikin hasken rana a yankin Dholera Special Investment Region (DSIR), Gujarat . [1] [2] An rarraba shi a matsayin Ultra Mega Solar Power Project, ta Ma'aikatar Sabon da Sabunta Makamashi na Gwamnatin Tsakiyar Indiya ; iya aiki zai zama 5 GW ta 2030. [3] [4]
Tarihi
[gyara sashe | gyara masomin]Fage
[gyara sashe | gyara masomin]Gwamnatin Indiya tana da burin kara yawan wutar [5] ake samu daga makamashin da ake sabuntawa zuwa 175 GW nan da shekarar [6] an cimma wannan manufa ne yayin da ya rage shekaru hudu a kammala. Bayan wannan gwamnatin Narendra Modi ta kara yawan abin da aka sa gaba zuwa 100GW. [7]
Babban Ministan Gujarat ya amince da filin shakatawa na Dholera Solar a cikin Afrilu 2018.
Auctions
[gyara sashe | gyara masomin]An gudanar da gwanjo a cikin 2020. [8] An ga martanin da ya wuce 600 MW. [9] Farashin da aka gano yana tsakanin ₹ 2.78 da ₹ 2.81 kowace raka'a. Kamfanoni biyar ne aka baiwa 100-200MW kowanne. Koyaya bin ƙananan farashi na ₹ 1.99 kowace raka'a yayin gwanjo na gaba, an soke kwangilolin na asali kuma an sanya sabbin tashoshi. [8] A cikin 2018 da 2019 irin wannan sokewar a Gujarat an yi. [10] Wadannan kwangilolin da aka soke a Gujarat sun haifar da Uttar Pradesh kuma ya soke tayin gwanjon hasken rana mai karfin MW 500. [11]
Manazarta
[gyara sashe | gyara masomin]- ↑ "Dholera Solar Park, Gujarat". Power Technology (in Turanci). Retrieved 2021-05-16.
- ↑ Gupta, Uma (17 March 2021). "Gujarat retenders 700 MW in Dholera Solar Park and 100 MW in Raghanesda". pv magazine India (in Turanci). Retrieved 2021-05-16.
- ↑ "TATA Power lays foundation of 400 MW (AC) Solar Power Project at the 5000 MW Solar Park in Dholera Special Investment Region in Gujarat". EquityBulls. 2020-10-17. Archived from the original on 2021-05-16. Retrieved 2021-05-16.
- ↑ "Gujarat's solar flip ups the risk of a larger flop". mint (in Turanci). 2021-02-09. Retrieved 2021-05-16.
- ↑ "Current Status | Ministry of New and Renewable Energy, Government of India". Ministry of New and Renewable Energy, Government of India. Archived from the original on 21 April 2021. Retrieved 2021-05-22.
- ↑ Dave, Kapil Dave (11 April 2018). "5,000MW solar park to come up in Dholera". The Times of India (in Turanci). Retrieved 2021-05-22.
- ↑ "Is India's solar power sector ready for its technology-driven metamorphosis?". ETEnergyworld (in Turanci). 3 February 2021. Retrieved 2021-05-22.
- ↑ 8.0 8.1 Chandrasekaran, Kaavya (1 February 2021). "Gujarat cancels results of solar auctions, feels tariffs are high". ETEnergyworld (in Turanci). Retrieved 2021-05-22.
- ↑ Prateek, Saumy (1 August 2020). "Dholera Solar Park Tender Oversubscribed by 600 MW - Saur Energy International". Saur Energy. Retrieved 2021-06-03.
- ↑ Prasad, Nithin Thomas (2021-02-03). "In Another Bad Precedent, Gujarat Regulator Allows DISCOM to Scrap 700 MW Solar Auction". Mercom India (in Turanci). Retrieved 2021-06-03.
- ↑ Ranjan, Rakesh (2021-06-03). "Uttar Pradesh Scraps 500 MW Solar Auction, Plans to Re-Auction Hoping for Lower Bids". Mercom India (in Turanci). Retrieved 2021-06-03.