Gonar Ada Foah Wave Farm sune gonakin igiyar ruwa na farko a Afirka da aka fara aiki a Ada Foah, Ghana . Kamfanin Seabased na Sweden ne ya ƙera aikin matukin jirgi mai lamba 400 KW . [1] A ranar 20 ga Maris 2018, Seabased ya rattaba hannu kan wata yarjejeniya tare da kamfanin samar da makamashi na TC's Energy na Ghana don fadada aikin zuwa 100 MW . [2] [3]

  1. "Ghana Project". Seabased. Archived from the original on 30 April 2019. Retrieved 30 April 2019.
  2. Harris, Michael (21 March 2018). "Seabased signs deal to install 100 MW wave energy park in Ghana". HydroWorld. Retrieved 30 April 2019.
  3. "Seabased signs 100 MW Wave Power Plant Contract with Ghana". Seabased. 20 March 2018. Archived from the original on 30 April 2019. Retrieved 30 April 2019.